We are using cookies This website uses cookies in order to offer you the most relevant information. By browsing this website, you accept these cookies.
Did you know? You can double click on a word to look it up on TermGallery.
Meanings of fail blowout in anglès
We have no meanings for "fail blowout" in our records yet.
Usage of fail blowout in anglès
1
The LMRP sits atop a failedblowout preventer at the seabed.
2
BP wants to replace the failedblowout preventer first.
3
An underwater robot gripped a saw near the leaking pipe atop a failedblowout preventer.
4
The firm abandons efforts to close valves on a failedblowout preventer with underwater robots.
5
The current cap is on the jagged remnant of a pipe atop failedblowout preventer equipment.
6
Or BP may swap the failedblowout preventer for another, which would take less time, he said.
7
A second leak stems from a bent pipe connected to the failedblowout preventer at the seabed.
8
The Q4000 is connected to a failedblowout preventer at the seabed via a hose and pipe.
9
The top kill involved pumping heavy drilling fluid through hoses connected to a failedblowout preventer and into the well.
10
Both involve pumping mud and cement into the well through a hose connected to a failedblowout preventer at the seabed.
11
Like the Helix, the Toisa Pisces will be hooked up to the failedblowout preventer atop the well via a hose and pipe.
12
The second system siphons oil through a hose connected to a failedblowout preventer at the seabed to Helix Energy Solutions' Q4000 service rig.
13
Of the current oil-siphoning systems, one channels oil from a containment cap atop failedblowout preventer equipment through a fixed pipe to a drillship.
14
A second, smaller leak is coming from the bent pipes that stem from that piece of equipment on top of the failedblowout preventer.
15
The top kill involves pumping drilling "mud," or fluids heavier than oil, into the failedblowout preventer and then down the well.
16
Other short-term options included a "junk shot" of pieces of rubber and other materials into the failedblowout preventer over the leaking well.