The detailed cost of repairing the reservoir lining is given in the followingtabulations:
2
Kasamori then handed Dr. Akechi the followingtabulation of the results of the word-association test:
3
The variation for a 100 cubic foot cylinder at various temperatures is given in the followingtabulation:
4
The total and unit cost of constructing the concrete piers and abutments and of erecting the steel superstructure are given in the followingtabulation.
5
The followingtabulation will show how two of these questions are answered for the 6,141 pupils here reported on.