Aún no tenemos significados para "require by subsection".
1On July 1, 1995, section 914 expired as required by subsection (e).
2(2) makes registration for the work, if required by subsection (a), within three months after its first transmission.
3(B) where the cable system has not deposited the statement of account and royalty fee required by subsection (d).