Мы используем Cookies Этот веб-сайт использует cookie-файлы, чтобы предлагать вам наиболее актуальную информацию. Просматривая этот веб-сайт, Вы принимаете cookie-файлы.
However, there are concerns that the F35-B could end up costing more in the long run.
2
Perhaps the F35 can finally fully enter service and use some of its new moves in combat.
3
The F35 won't need to be stealthy as it won't have to get close before firing one.
4
All F35s are slower, less manoeuvrable and with less range and lighter payload than machines built to purpose.
5
The fully combat-ready F35 flew a square loop, meaning super tight corners, to show off aggressive, hurl-inducing turns.
6
That £6bn does not include the cost of buying the new F35 jets for the carrier.
7
Last year, the US senate armed services committee came within one vote of calling for the cancellation of the entire F35 programme.
8
The development of the F35, a stealth fighter bomber made by Lockheed Martin, has been plagued by technical problems and cost overruns for years.
9
The government's Strategic Defence and Security Review will include plans to boost the UK's F35 Joint Strike Fighter aircraft to 24 by 2023.
10
Her throw was the second longest in the field but she came fifth in the F35-38 event and did not make it to the podium.
11
It is the size of a small commercial airliner and packed with electronic surveillance gadgetry costing $130m, considerably more than the new US F35 fighter.