The power utility cited shortages of generation capacity resulting from unplannedbreakdowns.
2
We have had an increase in unplannedbreakdowns and identified further system risks.
3
Eskom must be very close to loadshedding with this high level of unplannedbreakdowns.
4
When grid maintenance meets unplannedbreakdowns, load shedding is imminent.
5
Another series of unplannedbreakdowns at Eskom's power plants has put South Africa on edge once more.
6
They gave a list of factors which could force rolling blackouts: Additional unplannedbreakdowns to power generation units.
7
The unplannedbreakdowns are now down to just 10 500 MW.
8
Ramaphosa noted that, in addition to bad weather and unplannedbreakdowns, elements of sabotage were responsible for the country's recent energy crisis.
9
But both mega projects, the largest of their kind in the southern hemisphere, have been plagued by mismanagement, unplannedbreakdowns and ballooning costs.
10
Eskom's unplannedbreakdowns Electrical engineer and publisher, Chris Yelland said on Friday 20 December that Eskom must be very close to load shedding.
11
The beleaguered firm are blaming everything from a host of unplannedbreakdowns to the supply of "wet coal" for their struggles.
12
There are high levels of " unplannedbreakdowns", which have exceeded the power limit of 10 500 MW.
13
The problems include: High levels of " unplannedbreakdowns", which have exceeded the power limit of 10 500 MW.
14
Load shedding is expected to be kept at bay on Monday 6 January, following a particularly disruptive weekend resulting from numerous unplannedbreakdowns at Eskom.
15
Eskom have been forced to crank load shedding up to Stage 4, after a series of unplannedbreakdowns made life difficult for the energy provider.
16
With unplannedbreakdowns above 10 500 MW, the probability of load shedding remains but will only be implemented if necessary.